Centennial Elementary School

Grades Served:
K–6
Total Square Footage:
34,336 new
3,800 remodeled
Occupancy Date:
August 2000
Construction Cost:
$3,144,395
General Contractor:
Cord Construction Company
Rockford, Illinois
Mechanical Consultant:
KJWW Engineering
Rock Island, Illinois
This 34,300-square foot addition doubles the existing 30,000 square foot facility. New spaces include a Gym, Media Center, Computer Lab, Classrooms, and General Office. As part of the remodeling package, the Kitchen was outfitted with new equipment, and the existing Gym/Cafeteria received a facelift for main use as a Cafeteria with incidental Multi-Purpose capacity.

These addition and remodeling components are the product of a Facilities Study we completed for all 3 of the District’s buildings. The study, based on the District’s enrollment projections reviewed overall building usage to derive optimal performance throughout the next 5-8 years and into the next phase of growth. Future resulting projects include an elevator addition to the junior high school.

(From Top) Outside the New Main Entrance; Main Entry Corridor with Administration Offices to the left; Media Center; Gymnasium; 1st Grade Room with moveable partitions to accomodate a larger group gathering.

Photos taken by Nels Akerlund