Durand K-12 School

Grades Served:
K-12
Total Square Footage:
26,130 new
27,644 remodeled
Occupancy Date:
August 2000
Construction Cost:
$3,380,300
General Contractor:
W. Molitor Construction Inc.
S. Beloit, Wisconsin
Mechanical Consultant:
KJWW Engineering Consultants
Madison, Wisconsin
Civil Engineer:
Arnold Lundgren Associates
Rockford, Illinois
One major addition includes the Cafeteria, Kitchen and support areas. A new team lockerroom will supplement the existing lockerrooms beneath the stage area. The new Home Economics room is purposely placed in close proximity to the Kitchen and the new Science room placed in a hub with two other science rooms. A shared storage room connects two of the rooms. The new Media Center has split usage by both the Elementary and the Junior/High School and is adjoined by two remodeled computer labs. An additional stacks area adds room to the Junior/High School side. The Final new addition is the area north of the corridor that runs through the general office area and includes the waiting area, staff workroom and boardroom.

Remodeled areas include the remainder of the administration area, seven classrooms, PE area, and the two computer labs and stack area that adjoin the media center.

(From Top) The new Media Center with the visual center in the background; New Art Room; New General Office; New Science Lab; New Multi-Purpose Room/Cafeteria.