Total Square Footage:
9,110 new
3,794 remodeled
Occupancy Date:
August 2000
Construction Cost:
$1,118,330
General Contractor:
Brown Construction Company
Milledgeville, Illnois
Mechanical Consultant:
Engineering Services Mech. Cons.
Rockford, Illinois
Civil Engineer:
Arnold Lundgren Associates
Rockford, Illinois
A 10-Year Life Safety study resulted in a 9,100 square foot addition and 3,800 square feet of remodeling work to Eastland High School. The addition adds two new classrooms to the number of existing rooms, a science lab and new Media Center with adjoining computer lab, conference room and audio/visual storage room.

The old Media Center and computer lab were remodeled into the new music room, practice room and office. The new Media Center including support rooms is twice the square footage of the old Media Center. The existing Music Room now is used as a weight room.

(From Top) New Media Center looking towards the office and work room behind the check-out counter; Music room; Computer Lab which adjoins the Media Center.